Transmission

Alupar Transmitters have a wide national transmission network in operation consisting of overhead lines and substations with varying voltage levels. Alupar participates in 35 electricity transmission companies in Brazil with a concession term of 30 years and two for life, one in Colombia and the other in Chile.

The Alupar Transmission

 

Transmission System Extension
1 Tucuruí – Vila Conde (ETEP) 323 km
2 Tucuruí – Açailândia (ENTE) 464 km
3 Vila Conde – Santa Maria (ERTE) 179 km
4 Tucuruí – P. Dutra (EATE) 924 km
5 Campos Novos – Blumenau (ECTE) 252.5 km
6 Terezina-Fortaleza (STN) 541 km
7 Irapé – Montes Claros (TRANSLESTE) 150 km
8 Itutinga – Juíz de Fora (TRANSUDESTE) 140 km
9 Irapé – Araçuí (TRANSIRAPÉ) 65 km
10 Barra Grande – Lages-Rio Sul (STC) 195 km
11 Machadinho – Campos Novos (LUMITRANS) 51 km
12 Verona – Mascarenha (ETES) 107 km
13 Sinop-Sorriso-Nova Mutum / Parecis – Maggi / Juína-Maggi-Juba (EBTE) 775 km
14 Jauru – Cuiaba (TME) 348 km
15 Subestação Santos Dumont – Minas Gerais (ESDE) 0 km
16 Nova Mutum – Nobres – Cuiabá (ETEM) 235 km
17 Subestação Várzea Grande (ETVG) 0 km
18 Eng. Lechuga – Boa Vista (TNE) 715 km
19 Subestações Abdon Batista e Gaspar (ETSE) 0 km
20 Subestações Manoel da Nóbrega e Domênico Rangoni (ELTE) 40 km
21 Subestação João Câmara II – João Câmara III (ETAP) 20 km
22 Subestação Rio Novo do Sul (ETC) 0 km
23 Poções III – Padre Paraíso 2 / Padre Paraíso 2 – Governador Valadares 6 (TPE) 541 km
24 Governador Valadares 6 – Mutum / Mutum – Rio Novo do Sul (TCC) 288 km
25 Mesquita – João Neiva 2 (ESTE) 236 km
26 Virginia – Nueva Esperanza (TCE) 235 km
27 Fernão Dias – Terminal Rio (TSM) 330 km
28 Juazeiro III – Ourolândia II / Bom Jesus da Lapa II – Gentio do Ouro II (ETB) 446 km
29 Ibicoara – Poções III / Poções III – Poções II (EDTE) 170 km
30 Coxipó – Cuiabá / Cuiabá – Rondonópolis (AETE) 193 km
31 El Pimiento – Mote Blanco / El Pimiento – El Lazo / Monte Blanco – El Lazo (TES) 15,9 km
32 Subestação Seccionadora El Pimiento (TES) 0 km
33 Subestação Monte Blanco (TES) 0 km
34 Subestação El Lazo (TES) 0 km
35 Yopal – Sogamoso (TEL) 100 km
36 Subestação Alcaraván (TEL) 0 km
37 Subestação Santo Antonio (TEL) 0 km
38 Subestação Lambayeque Norte (TCN) 0 km
39 Subestação Piura Este (TCN) 0 km
40 Subestação Centro 345-230/88 0 km
41 La Ninã – Felam 9 km
42 Subestação Centro 345-230/20 0 km
43 Silvânia- Nova Ponte / Nova Ponte – Ribeirão Preto (LOTE 2) 551 km
Total 8.805 km

Generation

Alupar has diversified its electric power matrix by investing in activities of small and medium generation plants, such as HPPs, SHPPs, Wind Farms and Photovoltaic Power Plant, in Brasil, Colombia and Peru. The Company holds the concessions / authorization assets to within 30 to 35 years in Brazil and lifetime in Colombia and Peru.

Our plants in Brazil are part of the Energy Reallocation Mechanism (“MRE”), mitigating the hydrological risk and ensuring predictability in the cash flow of our assets already contracted.
Bellow you will find a map pointing out Alupar‘s power plants.

Generation

 

GENERATORS INSTALLED CAPACITY
1 HPP São José 51.0 MW
2 HPP Foz do Rio Claro 68.4 MW
3 SHPP Queluz 30.0 MW
4 SHPP Lavrinhas 30.0 MW
5 HPP Ferreira Gomes 252.0 MW
6 SHPP Morro Azul 19.9 MW
7 WPP Energia dos Ventos 98.7 MW
8 SHPP Verde 08 30.0 MW
9 HPP La Virgen 93.8 MW
10 WPP Agreste Potiguar (AW Santa Régia and AW São João) 63.0 MW
11 PPP Pitombeira (Solar) 61.7 MW
Total 798,5